Mon - Sat 9AM - 6PM
(+1) 212-946-2100
0

No hay productos en el carrito.

Get Started Get Started
  • Inicio
  • Nosotros
  • Servicios
  • Compromiso
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
  • Inicio
  • Nosotros
  • Servicios
  • Compromiso
  • Inicio
  • Nosotros
  • Servicios
  • Compromiso
0

No hay productos en el carrito.

Get Started Get Started
  • Inicio
  • Nosotros
  • Servicios
  • Compromiso
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

renewable

HomeBlogPosts Tagged "renewable"
septiembre 26, 2023 Technology

The new electric vehicle charging stations to meet Biden’s goal

Thomas Smith is director and head of global systems at modern-methods consultancy Bryden Wood The past decade has seen the government consistently heading in the same direction, towards value-led outcomes.

Read More
septiembre 26, 2023 Solar Power

The Trina Solar’s 210 PERC cell reaches record 24% efficiency

Architecture and Engineering studio Foster + Partners has won planning permission to redevelop a triangular site in Beverly Hills, Los Angeles, with a botanical garden and a pair of plant-covered high-rises.

Read More
septiembre 26, 2023 Renewable Energy

The urgency of advancing battery storage for renewables

The organisations said it was looking for commissioners from the energy sector, or tho- se who specialise in the relationship between infrastructure and the environment, or infrastructure policy.

Read More
septiembre 26, 2023 Technology

The new electric vehicle charging stations to meet Biden’s goal

Thomas Smith is director and head of global systems at modern-methods consultancy Bryden Wood The past decade has seen the government consistently heading in the same direction, towards value-led outcomes.

Read More
septiembre 19, 2023 Base Metals

The role critical minerals will play the world transitions net-zero

Architecture and Engineering studio Foster + Partners has won planning permission to redevelop a triangular site in Beverly Hills, Los Angeles, with a botanical garden and a pair of plant-covered high-rises.

Read More

Recent Posts

  • Hello world!
  • The Trina Solar’s 210 PERC cell reaches record 24% efficiency
  • The urgency of advancing battery storage for renewables
  • The new electric vehicle charging stations to meet Biden’s goal
  • The Trina Solar’s 210 PERC cell reaches record 24% efficiency

Recent Comments

  1. A WordPress Commenter en Hello world!
  2. Thomas Smith en Infrastructure Commission seeks three new senior members
  3. Thomas Smith en Infrastructure Commission seeks three new senior members
  4. Thomas Smith en Infrastructure Commission seeks three new senior members
  5. Thomas Smith en Cordless brushless 1/2-in (Kit 2 batteries)

Archives

  • septiembre 2024
  • septiembre 2023

Categories

  • Architecture
  • Base Metals
  • Commodities
  • Construction
  • Engineering
  • Environmental
  • Mining
  • Oil & Gas
  • Petrolium
  • Renewable Energy
  • Solar Power
  • Technology
  • Uncategorized

Categories

  • Architecture 3
  • Construction 5
  • Engineering 6
  • Oil & Gas 3
  • Petrolium 3
  • Uncategorized 1

Recent Posts

  • Hello world!

  • The Trina Solar’s 210 PERC cell reaches record 24% efficiency

  • The urgency of advancing battery storage for renewables

Tags

Careers Chemical Construction Electrical Electricial Engineering Mechanical Mining renewable

Follow Us

Cadereyta, Nuevo León
Lunes - Sabado : 8.00am 5:00pm
(+52) 828 1089 765

Nuestros Proyectos

Gestión de Energía
Producción de Insumos
Mantenimiento Preventivo y Correctivo

Menu de Navegacion

Inicio
Nosotros
Servicios

© All Copyright 2024 de Primex Energy.  Sitio web creado por Pixelhead